The goal of this user would be to maximize day time irradiation from the sun to power basic operational appliances for residential or commercial purposes like,2unit of 1 HP Inverter Air-condition, washing machine, pumping machine, freezer, fridge, lights, fan, TV while achieving close to Zero electricity bills during the day and loads like a few lights, fans ,Air conditioner, TV and refrigerator during the night; the users in this category can improve on their battery bank storage over time if more appliances would be needed to be operational at night.
Inverter Compartment Cost Breakdown
GROWATT 5kW-48Vdc Hybrid Inverter 24months Warranty | ₦548,000 |
Option A: SRNE 10kWh Lithium Battery 10.24kWh: 51.2V 200ah, 10years Warranty, 20years+ lifespan | ₦3,100,000 |
Option B: ITEL 10kWh Lithium Battery 10.24kWh: 51.2V 200ah, 5years Warranty, 15years+ lifespan | ₦1,975,000 |
Breakers & Surge Protection kit
|
₦74,000 |
Cables | ₦52,750 |
Installation Cost To include fittings, screws and trunks | ₦60,000 |
Option A Total | ₦3,834,750 |
Option B Total | ₦2,709,750 |
Solar Compartment Cost Breakdown
5535Wp Solar Panel (9x 615W Jinko Solar Panel) 12years Warranty, Upto 30years Life Span | ₦1,242,000 |
Solar Rack x4 | ₦48,000 |
Cables, Breakers & Surge Protection kit
|
₦71,000 |
Installation Cost | ₦108,000 |
Total | ₦1,469,000 |
Option A: Total Installation Cost (solar+inverter) | ₦5,303,750 |
Option B: Total Installation Cost (solar+inverter) | ₦4,178,750 |
NB:
- PV cables lengths are estimated for a single floor connection(i.e a bungalow), where extra floors exist, there would be an estimated 5meters addition in the length of PV Cables .
- Logistics cost would be based on location.
- AC Cable length are given based on close estimation, where it is in excess, Thrillhouse Limited would be willing to buy the excess (except when less than a meter), where it is in deficit, client would pay for the extra)
- Roof top installation has been assumed; any other location might require extra fabrication expense.
- Panel Installation increases by 1500 as floors increase